Our Projects

Name: Chevron Phillips Headquarters Relocation

Location: The Woodlands, TX

Job Info: Design-Build | 305,000 SF | $130M+

Project Info: High-end Class A office renovation delivered through a design-build partnership. Project included full interior demolition, MEP/AV/IT infrastructure, specialty finishes, exterior amenity spaces, and a six-story precast parking garage, and campus hardscape improvements — delivered on time and under budget. 

Name: Chevron Phillips Kingwood Lab Renovation – Buildings 1 & 6

Location: Kingwood, TX

Job Info: Laboratory Renovation & New Construction | 45,000+ SF

Project Info: Multi-phase laboratory renovation and high-bay lab construction within an active research facility. Work included complex MEP systems, process piping, lab casework, and safety systems, all executed while maintaining ongoing operations. 

Name: Chevron Phillips KRTC Lab Modernization

Location: Kingwood, TX

Job Info: Ground-Up Lab & Renovation | $32.4M

Project Info: Large-scale laboratory modernization project consisting of new construction and renovation of existing lab spaces. The project was executed over a 27-month duration with extensive coordination, safety planning, and phased delivery. 

Name: RFL Central Park – Greenspace Development

Location: The Woodlands, TX

Job Info: Site Development & Amenities | $5M+

Project Info: Large-scale laboratory modernization project consisting of new construction and renovation of existing lab spaces. The project was executed over a 27-month duration with extensive coordination, safety planning, and phased delivery. 

Name: MP3 Business Park

Location: Hockley, TX

Job Info: Ground-Up Industrial Development | $8M+

Project Info: Ground-up construction of three concrete tilt-wall industrial buildings across a 26-acre site. Work included underground utilities, detention pond construction, structural steel for overhead cranes, and Class A interior build-out within an active development environment. 

Name: TONEY Headquarters

Project Info: A custom design-build project, which now serves as our headquarters. The Premier, a distinctive two-story office building, stands as a testament to our commitment to quality and innovation. The structure boasts high-end finishes, a distinctive entrance and lobby, a free-spanning staircase, private offices for each team member, executive office suites, a fully equipped workout facility, a recreational game room, a diesel backup generator, and more. 

In addition to the office space, a climate-controlled shop was also constructed spanning over 5,000SF. This facility serves as a secure and efficient storage space for our construction equipment, tools, trailers, trucks, and emergency response equipment. Our headquarters represents the embodiment of our dedication to excellence and our continuous pursuit of providing top-tier services.

Name: IAH Generator Project

Client: CBRE/Consolidated Car Rental, LLC

Project Info: Toney installed a combination of (2) 200KW, (3) 300KW, and (1) 600KW Taylor Generators to serve as a backup power solution for the parking garage, office building, and bus maintenance facility. There were unique challenges to overcome due to the height of the underbelly of diesel fuel tanks and breaker panels. Specialized access platforms were meticulously designed and  installed to address this, making maintenance and breaker panel access hassle-free. 

Generators were also integrated into the building’s BAS system. This integration empowers the Building Maintenance Group to maintain real-time monitoring of generator functions and operations, adding an extra layer of efficiency and reliability. 

The ground was stripped to install the generator foundations with precision. The setup included ATS (Automatic Transfer Switches) and conduits expertly installed at each generator tie-in point. The project also included the application of Ground Face CMU Stone, the addition of Ameristar Decorative Iron Fencing or Louvered Fencing, 57 Stone for aesthetic finishing touches, and various other enhancements.