Name: Chevron Phillips Kingwood Lab Renovation
Client: Chevron Phillips
SQ Footage: 5,000
Project Info: This project consists of a 5,000SF lab renovation within the Chevron Phillips Kingwood research facility. Three ancillary rooms were repurposed as lab support areas and the scope of work included the replacement of the existing ceiling with a new suspended ACT ceiling, demo and abate existing flooring to install new resinous epoxy flooring, and new lab casework, fume hoods, and safety showers were provided.
New rooftop HVAC equipment and structural steel were installed to stiffen the new duct openings. Critical gas piping was installed throughout the entire space to all hoods, benches, and equipment domestic and DI water installed.
To keep operations running as normal with a seamless transition during remodeling, two phases of work were scheduled. The project was started and completed in 2019 ahead of schedule, under budget, and with no safety incidents
Name: Hockleywood
Client: MP3 Land & Cattle
SQ Footage: 56,000SF within 3 structures
Project Info: This project consists of a ground-up development and interior build-out project for MP3 Land and Cattle in Hockey, Texas. The contract included site and underground utility work for a 26-acre site with a 2.64-acre detention pond. Two 24,000-square-foot and one 8,000-square-foot concrete tilt-wall industrial buildings were also constructed with structural steel support for overhead cranes. The interior of one 24,000-square-foot building received class-A finishes.
Name: TONEY Headquarters
Client: Toney Construction Services, Inc.
Project Info: A custom design-build project, which now serves as our headquarters. The Premier, a distinctive two-story office building, stands as a testament to our commitment to quality and innovation. The structure boasts high-end finishes, a distinctive entrance and lobby, a free-spanning staircase, private offices for each team member, executive office suites, a fully equipped workout facility, a recreational game room, a diesel backup generator, and more.
In addition to the office space, a climate-controlled shop was also constructed spanning over 5,000SF. This facility serves as a secure and efficient storage space for our construction equipment, tools, trailers, trucks, and emergency response equipment. Our headquarters represents the embodiment of our dedication to excellence and our continuous pursuit of providing top-tier services.
Name: IAH Generator Project
Client: CBRE/Consolidated Car Rental, LLC
Project Info: Toney installed a combination of (2) 200KW, (3) 300KW, and (1) 600KW Taylor Generators to serve as a backup power solution for the parking garage, office building, and bus maintenance facility. There were unique challenges to overcome due to the height of the underbelly of diesel fuel tanks and breaker panels. Specialized access platforms were meticulously designed and installed to address this, making maintenance and breaker panel access hassle-free.
Generators were also integrated into the building’s BAS system. This integration empowers the Building Maintenance Group to maintain real-time monitoring of generator functions and operations, adding an extra layer of efficiency and reliability.
The ground was stripped to install the generator foundations with precision. The setup included ATS (Automatic Transfer Switches) and conduits expertly installed at each generator tie-in point. The project also included the application of Ground Face CMU Stone, the addition of Ameristar Decorative Iron Fencing or Louvered Fencing, 57 Stone for aesthetic finishing touches, and various other enhancements.